Natural gasOperatingCPLE

Sherwood H Smith Jr Energy Complex

Natural gas power plant in Richmond County, North Carolina. 2,244.8 MW of nameplate capacity across 11 generators, operated by Duke Energy Progress - (NC).

Also known as EIA plant 7805

Analyst: free account, 1 question a day.

McKinney BESSESA Hamlet NC , LLCCounty Home Solar LLCSherwood H Smith Jr E…5 km
Open in the map
6 plants within 9.7 km, from EIA coordinates.

Key facts

Capacity
2,244.8 MWNameplate
Generators
11 operatingEIA-860M, August 2026
Operating since
May 2001First generator online
Operator
Duke Energy Progress - (NC)EIA operator ID 3046
Grid
CPLEBalancing authority CPLE
Price nodes
None linkedNo verified ISO node
Location
Richmond County, NC34.8392, −79.7406
EIA plant ID
7805EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Sherwood H Smith Jr Energy Complex produces

Free · EIA-923

Net generation, 2025

9.85 TWh

9,853,136 MWh, final

Capacity factor, 2025

50.1%

2024: 47.8%

January to July 2026

5.85 TWh

Provisional

Range, 2016 to 2025

8.3–11.9

TWh a year. Low 2021, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001542,442Not reported12 of 12
20021,479,857Not reported12 of 12
20031,048,155Not reported12 of 12
20041,744,104Not reported12 of 12
20052,167,402Not reported12 of 12
20061,785,463Not reported12 of 12
20072,371,860Not reported12 of 12
20082,460,521Not reported12 of 12
20093,125,390Not reported12 of 12
20104,739,332Not reported12 of 12
20116,474,714Not reported11 of 12
20129,278,586Not reported12 of 12
20139,080,38645.4%12 of 12
20147,684,21438.4%12 of 12
20159,832,464Not reported11 of 12
201610,658,24054.1%12 of 12
201710,229,47352.0%12 of 12
201811,895,68160.5%12 of 12
20199,392,55447.8%12 of 12
20208,581,07143.5%12 of 12
20218,266,51942.0%12 of 12
20229,920,41150.4%12 of 12
20238,597,61743.7%12 of 12
20249,424,32947.8%12 of 12
20259,853,13650.1%12 of 12
2026 (provisional, partial year)5,854,33451.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

4.62M

US short tons. 2024: 4.32M

SO₂, 2025

3

US short tons

NOx, 2025

543

US short tons

CO₂ per MWh, calculated

0.47 t

About 938 lb per MWh

9 of 9 EPA units reported CO₂ in 2025 (1, 10, 2, 3, 4, 6, 7, 8, and others), matched to EIA plant 7805 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,662

million gallons

Consumption, 2024

1,491

million gallons

Source

Pee Dee River

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.238

USGS SUI, HUC12 Everetts Lake-Marks Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
001Natural Gas Fired Combustion Turbine199.4May 2001
002Natural Gas Fired Combustion Turbine199.4May 2001
003Natural Gas Fired Combustion Turbine199.4May 2001
004Natural Gas Fired Combustion Turbine199.4May 2001
6Natural Gas Fired Combustion Turbine199.4June 2002
7Natural Gas Fired Combined Cycle199.4June 2002
8Natural Gas Fired Combined Cycle199.4June 2002
9Natural Gas Fired Combined Cycle191.2June 2011
10Natural Gas Fired Combined Cycle191.2June 2011
ST4Natural Gas Fired Combined Cycle195.5June 2002
ST5Natural Gas Fired Combined Cycle271.1June 2011

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Progress - (NC) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Sherwood H Smith Jr Energy Complex and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Sherwood H Smith Jr Energy Complex

More plants operated by Duke Energy Progress - (NC)

Questions about Sherwood H Smith Jr Energy Complex

How much power does Sherwood H Smith Jr Energy Complex produce?

Sherwood H Smith Jr Energy Complex reported 9,853,136 MWh (9.85 TWh) of net generation in 2025, a 50.1% capacity factor on 2,244.8 MW of nameplate capacity. From January to July 2026 it reported 5.85 TWh, which is provisional.

Where is Sherwood H Smith Jr Energy Complex?

Sherwood H Smith Jr Energy Complex is in Richmond County, North Carolina, at 34.8392, −79.7406. It is in the Duke Energy Progress East balancing area (CPLE).

Who operates Sherwood H Smith Jr Energy Complex?

EIA-860M for August 2026 lists Duke Energy Progress - (NC) as the operator (EIA operator ID 3046). The operator is not always the owner.

When did Sherwood H Smith Jr Energy Complex start operating?

Its first generator began operating in May 2001, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page