NuclearOperatingCPLE

Harris (NC)

Nuclear power plant in Wake County, North Carolina. 950.9 MW of nameplate capacity across 1 generator, operated by Duke Energy Progress - (NC).

Also known as Harris Nuclear Plant · EIA plant 6015

Analyst: free account, 1 question a day.

Flatwood FarmMoncure Farm LLCTinker (NC)Arborgate SolarSouth Cary WRF Solar…Kathleen SolarHarris (NC)10 km
Open in the map
6 plants within 19 km, from EIA coordinates.

Key facts

Capacity
950.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 1987First generator online
Operator
Duke Energy Progress - (NC)EIA operator ID 3046
Grid
CPLEBalancing authority CPLE
Price nodes
None linkedNo verified ISO node
Location
Wake County, NC35.6334, −78.9556
EIA plant ID
6015EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Harris (NC) produces

Free · EIA-923

Net generation, 2025

7.83 TWh

7,830,555 MWh, final

Capacity factor, 2025

94.0%

2024: 92.1%

January to July 2026

4.98 TWh

Provisional

Range, 2015 to 2025

7.3–8.6

TWh a year. Low 2015, high 2023

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20006,877,960Not reported12 of 12
20015,368,496Not reported12 of 12
20027,835,056Not reported12 of 12
20037,237,104Not reported12 of 12
20047,008,428Not reported12 of 12
20057,930,828Not reported12 of 12
20067,029,268Not reported12 of 12
20077,403,050Not reported12 of 12
20087,821,411Not reported12 of 12
20097,403,161Not reported12 of 12
20107,080,61585.0%12 of 12
20118,112,12797.4%12 of 12
20127,114,36585.2%12 of 12
20136,888,36382.7%12 of 12
20148,048,57596.6%12 of 12
20157,272,17787.3%12 of 12
20167,513,05189.9%12 of 12
20178,208,57398.5%12 of 12
20187,587,914Not reported12 of 12
20197,610,59491.4%12 of 12
20208,275,59399.1%12 of 12
20217,986,73395.9%12 of 12
20227,806,86793.7%12 of 12
20238,609,278103.4%12 of 12
20247,690,46092.1%12 of 12
20257,830,55594.0%12 of 12
2026 (provisional, partial year)4,979,059102.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

9,918

million gallons

Consumption, 2024

4,848

million gallons

Source

Shearon Harris Reservoir

Surface, Fresh. Natural-draft tower

Watershed stress

High · 0.648

USGS SUI, HUC12 White Oak Creek

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Nuclear950.9May 1987

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Progress - (NC) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Harris (NC) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Harris (NC)

More plants operated by Duke Energy Progress - (NC)

Questions about Harris (NC)

How much power does Harris (NC) produce?

Harris (NC) reported 7,830,555 MWh (7.83 TWh) of net generation in 2025, a 94.0% capacity factor on 950.9 MW of nameplate capacity. From January to July 2026 it reported 4.98 TWh, which is provisional.

Where is Harris (NC)?

Harris (NC) is in Wake County, North Carolina, at 35.6334, −78.9556. It is in the Duke Energy Progress East balancing area (CPLE).

Who operates Harris (NC)?

EIA-860M for August 2026 lists Duke Energy Progress - (NC) as the operator (EIA operator ID 3046). The operator is not always the owner.

When did Harris (NC) start operating?

Its first generator began operating in May 1987, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page