Natural gasOperatingDUK

Lee Combined Cycle Plant

Natural gas power plant in Wayne County, North Carolina. 1,068 MW of nameplate capacity across 4 generators, operated by Duke Energy Progress - (NC).

Also known as H.F. Lee Combined Cycle Plant · EIA plant 58215

Analyst: free account, 1 question a day.

Wayne County Energy ComplexLane SolarLane II Solar, LLCWayne Solar II LLCNew Rosewood BESSRosewood SolarLee Combined Cycle Plant2 km
Open in the map
6 plants within 7.3 km, from EIA coordinates.

Key facts

Capacity
1,068 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
December 2012First generator online
Operator
Duke Energy Progress - (NC)EIA operator ID 3046
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Wayne County, NC35.3736, −78.0894
EIA plant ID
58215EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lee Combined Cycle Plant produces

Free · EIA-923

Net generation, 2025

5.74 TWh

5,735,818 MWh, final

Capacity factor, 2025

61.3%

2024: 69.8%

January to July 2026

3.62 TWh

Provisional

Range, 2015 to 2025

5.5–7.3

TWh a year. Low 2021, high 2017

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
20136,547,809Not reported12 of 12
20145,730,72271.1%12 of 12
20156,472,77680.3%12 of 12
20166,402,25079.2%12 of 12
20177,293,04890.5%12 of 12
20187,210,66689.5%12 of 12
20196,648,487Not reported12 of 12
20205,654,01260.3%12 of 12
20215,478,46158.6%12 of 12
20226,041,04664.6%12 of 12
20236,374,63068.1%12 of 12
20246,549,44769.8%12 of 12
20255,735,81861.3%12 of 12
2026 (provisional, partial year)3,624,78366.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.44M

US short tons. 2024: 2.78M

SO₂, 2025

2

US short tons

NOx, 2025

857

US short tons

CO₂ per MWh, calculated

0.43 t

About 853 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (01A, 01B, 01C), matched to EIA plant 58215 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

133,191

million gallons

Consumption, 2024

1,411

million gallons

Source

Quaker Neck Lake

Surface, Fresh. Recirculating with cooling pond

Watershed stress

Very low/none · 0.157

USGS SUI, HUC12 Quaker Neck Lake-Neuse River

12 of 12 cooling months report withdrawal. SUI of the HUC12 containing the plant. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1ANatural Gas Fired Combined Cycle221.0December 2012
1BNatural Gas Fired Combined Cycle221.0December 2012
1CNatural Gas Fired Combined Cycle221.0December 2012
ST1Natural Gas Fired Combined Cycle405.0December 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Progress - (NC) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lee Combined Cycle Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lee Combined Cycle Plant

More plants operated by Duke Energy Progress - (NC)

Questions about Lee Combined Cycle Plant

How much power does Lee Combined Cycle Plant produce?

Lee Combined Cycle Plant reported 5,735,818 MWh (5.74 TWh) of net generation in 2025, a 61.3% capacity factor on 1,068 MW of nameplate capacity. From January to July 2026 it reported 3.62 TWh, which is provisional.

Where is Lee Combined Cycle Plant?

Lee Combined Cycle Plant is in Wayne County, North Carolina, at 35.3736, −78.0894. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates Lee Combined Cycle Plant?

EIA-860M for August 2026 lists Duke Energy Progress - (NC) as the operator (EIA operator ID 3046). The operator is not always the owner.

When did Lee Combined Cycle Plant start operating?

Its first generator began operating in December 2012, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page