Natural gasOperatingCPLE

Asheville

Natural gas power plant in Buncombe County, North Carolina. 1,011.5 MW of nameplate capacity across 6 generators, operated by Duke Energy Progress - (NC).

Also known as Asheville Power Plant · EIA plant 2706

Analyst: free account, 1 question a day.

Asheville-Rock Hill BatteryBiltmore Solar FieldsSawtell SolarMetropolitan Sewerage DistrictAsheville10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
1,011.5 MWNameplate
Generators
6 operatingEIA-860M, August 2026
Operating since
June 1999First generator online
Operator
Duke Energy Progress - (NC)EIA operator ID 3046
Grid
CPLEBalancing authority CPLE
Price nodes
None linkedNo verified ISO node
Location
Buncombe County, NC35.4731, −82.5417
EIA plant ID
2706EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Asheville produces

Free · EIA-923

Net generation, 2025

3.68 TWh

3,679,829 MWh, final. 11 of 12 months reported

Capacity factor, 2025

45.4%

2024: 51.5%

January to July 2026

2.56 TWh

Provisional

Range, 2015 to 2023

1.3–4.0

TWh a year. Low 2017, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20002,731,525Not reported12 of 12
20012,562,213Not reported12 of 12
20022,672,293Not reported12 of 12
20032,268,397Not reported11 of 12
20042,217,694Not reported12 of 12
20052,487,381Not reported12 of 12
20062,407,380Not reported12 of 12
20072,514,654Not reported12 of 12
20082,347,494Not reported12 of 12
20092,190,418Not reported12 of 12
20102,494,26434.0%12 of 12
20111,766,22124.1%12 of 12
20122,022,60527.5%12 of 12
20131,357,87418.5%12 of 12
2014657,72127.3%4 of 12
20151,590,53921.7%12 of 12
20161,517,18820.6%12 of 12
20171,315,52017.9%12 of 12
20181,744,76823.8%12 of 12
20191,314,00419.6%11 of 12
2020Not reportedNot reported0 of 12
20213,791,74342.8%12 of 12
20224,014,93345.3%12 of 12
20233,878,96843.8%12 of 12
2024387,92851.5%1 of 12
20253,679,82945.4%11 of 12
2026 (provisional, partial year)2,562,53749.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.74M

US short tons. 2024: 1.62M

SO₂, 2025

9

US short tons

NOx, 2025

501

US short tons

4 of 4 EPA units reported CO₂ in 2025 (1, 2, 3, 4, CT5, CT7), matched to EIA plant 2706 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,963

million gallons

Consumption, 2024

1,697

million gallons

Source

Lake Julian

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.115

USGS SUI, HUC12 Avery Creek-French Broad River

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT5Natural Gas Fired Combined Cycle191.2December 2019
CT7Natural Gas Fired Combined Cycle191.2January 2020
GT1Natural Gas Fired Combustion Turbine211.7June 1999
GT2Natural Gas Fired Combustion Turbine211.8June 2000
ST6Natural Gas Fired Combined Cycle102.8December 2019
ST8Natural Gas Fired Combined Cycle102.8April 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Progress - (NC) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Asheville and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Asheville

More plants operated by Duke Energy Progress - (NC)

Questions about Asheville

How much power does Asheville produce?

Asheville reported 3,679,829 MWh (3.68 TWh) of net generation in 2025, a 45.4% capacity factor on 1,011.5 MW of nameplate capacity. From January to July 2026 it reported 2.56 TWh, which is provisional. 11 of 12 months were reported for 2025.

Where is Asheville?

Asheville is in Buncombe County, North Carolina, at 35.4731, −82.5417. It is in the Duke Energy Progress East balancing area (CPLE).

Who operates Asheville?

EIA-860M for August 2026 lists Duke Energy Progress - (NC) as the operator (EIA operator ID 3046). The operator is not always the owner.

When did Asheville start operating?

Its first generator began operating in June 1999, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page