HydroOperatingERCOT

Inks

Hydro power plant in Burnet County, Texas. 15 MW of nameplate capacity across 1 generator, operated by Lower Colorado River Authority.

Also known as Inks Power Plant · EIA plant 3598

Analyst: free account, 1 question a day.

Buchanan Dam (TX)Thomas C FergusonMarble FallsJohnson City BESSNorth Fork TXInks25 km
Open in the map
6 plants within 49 km, from EIA coordinates.

Key facts

Capacity
15 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
January 1938First generator online
Operator
Lower Colorado River AuthorityEIA operator ID 11269
Grid
ERCOTBalancing authority ERCO
Price nodes
1 ERCOT nodeResource nodes with prices
Location
Burnet County, TX30.7316, −98.3854
EIA plant ID
3598EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Inks produces

Free · EIA-923

Net generation, 2025

14.3 GWh

14,321 MWh, final

Capacity factor, 2025

10.9%

2024: 6.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

2.0–21.8

GWh a year. Low 2015, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200013,625Not reported12 of 12
20019,549Not reported12 of 12
200212,013Not reported12 of 12
200314,761Not reported12 of 12
200423,677Not reported12 of 12
200525,106Not reported12 of 12
200614,458Not reported12 of 12
200715,082Not reported12 of 12
200814,866Not reported12 of 12
200915,485Not reported12 of 12
20102,2721.7%12 of 12
201116,85712.8%12 of 12
20124,5183.4%12 of 12
20136,3844.9%12 of 12
20144,6823.6%12 of 12
20151,9511.5%12 of 12
201616,47912.5%12 of 12
20179,1547.0%12 of 12
201818,11813.8%12 of 12
201921,84616.6%12 of 12
20208,4296.4%12 of 12
20215,5204.2%12 of 12
202211,9579.1%12 of 12
20238,3796.4%12 of 12
20248,7496.6%12 of 12
202514,32110.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric15.0January 1938

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Lower Colorado River Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Inks and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Inks

More plants operated by Lower Colorado River Authority

Questions about Inks

How much power does Inks produce?

Inks reported 14,321 MWh (14.3 GWh) of net generation in 2025, a 10.9% capacity factor on 15 MW of nameplate capacity.

Where is Inks?

Inks is in Burnet County, Texas, at 30.7316, −98.3854. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Inks?

EIA-860M for August 2026 lists Lower Colorado River Authority as the operator (EIA operator ID 11269). The operator is not always the owner.

When did Inks start operating?

Its first generator began operating in January 1938, according to EIA-860M.

Does InfraMap have power prices for Inks?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to Inks, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page