Hyder Solar Hybrid
Solar and battery storage project in Yuma County, Arizona. 48 MW of nameplate capacity across 3 generators, operated by Arizona Public Service Co.
Also known as EIA plant 57563
This project groups Hyder Solar Hybrid (EIA 57563). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 48 MWSolar 32.0 · Battery storage 16.0
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- November 2011First generator online
- Operator
- Arizona Public Service CoEIA operator ID 803
- Grid
- AZPSBalancing authority AZPS
- Price nodes
- None linkedNo verified ISO node
- Location
- Yuma County, AZ33.0257, −113.3440
- EIA plant ID
- 57563EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Hyder Solar Hybrid produces
Free · EIA-923Net generation, 2025
31.2 GWh
31,232 MWh, final
Capacity factor, 2025
12.1%
2024: 13.4%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
31.2–42.0
GWh a year. Low 2025, high 2015
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | 3,076 | 15.8% | 12 of 12 |
| 2012 | 39,252 | 30.8% | 12 of 12 |
| 2013 | 41,430 | Not reported | 12 of 12 |
| 2014 | 41,990 | 21.8% | 12 of 12 |
| 2015 | 42,004 | 21.8% | 12 of 12 |
| 2016 | 40,655 | 21.0% | 12 of 12 |
| 2017 | 38,483 | 20.0% | 12 of 12 |
| 2018 | 37,780 | 19.6% | 12 of 12 |
| 2019 | 37,173 | 19.3% | 12 of 12 |
| 2020 | 36,347 | 18.8% | 12 of 12 |
| 2021 | 40,609 | Not reported | 12 of 12 |
| 2022 | 40,233 | 14.4% | 12 of 12 |
| 2023 | 32,205 | Not reported | 9 of 12 |
| 2024 | 35,259 | 13.4% | 12 of 12 |
| 2025 | 31,232 | 12.1% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| H116M | Batteries | 16.0 | April 2023 |
| PV1 | Solar Photovoltaic | 17.0 | November 2011 |
| PV2 | Solar Photovoltaic | 15.0 | February 2012 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arizona Public Service Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Hyder Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Hyder Solar Hybrid
More plants operated by Arizona Public Service Co
Questions about Hyder Solar Hybrid
How much power does Hyder Solar Hybrid produce?
Hyder Solar Hybrid reported 31,232 MWh (31.2 GWh) of net generation in 2025, a 12.1% capacity factor on 48 MW of nameplate capacity.
Where is Hyder Solar Hybrid?
Hyder Solar Hybrid is in Yuma County, Arizona, at 33.0257, −113.3440. It is in the Arizona Public Service Company balancing area (AZPS).
Who operates Hyder Solar Hybrid?
EIA-860M for August 2026 lists Arizona Public Service Co as the operator (EIA operator ID 803). The operator is not always the owner.
Is Hyder Solar Hybrid a solar or a battery storage plant?
Both. Solar capacity totals 32 MW and battery storage capacity totals 16 MW.
When did Hyder Solar Hybrid start operating?
Its first generator began operating in November 2011, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page