SolarBattery storageOperatingAZPS

Hyder Solar Hybrid

Solar and battery storage project in Yuma County, Arizona. 48 MW of nameplate capacity across 3 generators, operated by Arizona Public Service Co.

Also known as EIA plant 57563

This project groups Hyder Solar Hybrid (EIA 57563). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

McFarland B Solar and StorageAgua Caliente Solar ProjectWhite Wing SolarHyder Solar Hybrid10 km
Open in the map
6 plants within 16 km, from EIA coordinates.

Key facts

Capacity
48 MWSolar 32.0 · Battery storage 16.0
Generators
3 operatingEIA-860M, August 2026
Operating since
November 2011First generator online
Operator
Arizona Public Service CoEIA operator ID 803
Grid
AZPSBalancing authority AZPS
Price nodes
None linkedNo verified ISO node
Location
Yuma County, AZ33.0257, −113.3440
EIA plant ID
57563EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hyder Solar Hybrid produces

Free · EIA-923

Net generation, 2025

31.2 GWh

31,232 MWh, final

Capacity factor, 2025

12.1%

2024: 13.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

31.2–42.0

GWh a year. Low 2025, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
20113,07615.8%12 of 12
201239,25230.8%12 of 12
201341,430Not reported12 of 12
201441,99021.8%12 of 12
201542,00421.8%12 of 12
201640,65521.0%12 of 12
201738,48320.0%12 of 12
201837,78019.6%12 of 12
201937,17319.3%12 of 12
202036,34718.8%12 of 12
202140,609Not reported12 of 12
202240,23314.4%12 of 12
202332,205Not reported9 of 12
202435,25913.4%12 of 12
202531,23212.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
H116MBatteries16.0April 2023
PV1Solar Photovoltaic17.0November 2011
PV2Solar Photovoltaic15.0February 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arizona Public Service Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hyder Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hyder Solar Hybrid

More plants operated by Arizona Public Service Co

Questions about Hyder Solar Hybrid

How much power does Hyder Solar Hybrid produce?

Hyder Solar Hybrid reported 31,232 MWh (31.2 GWh) of net generation in 2025, a 12.1% capacity factor on 48 MW of nameplate capacity.

Where is Hyder Solar Hybrid?

Hyder Solar Hybrid is in Yuma County, Arizona, at 33.0257, −113.3440. It is in the Arizona Public Service Company balancing area (AZPS).

Who operates Hyder Solar Hybrid?

EIA-860M for August 2026 lists Arizona Public Service Co as the operator (EIA operator ID 803). The operator is not always the owner.

Is Hyder Solar Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 32 MW and battery storage capacity totals 16 MW.

When did Hyder Solar Hybrid start operating?

Its first generator began operating in November 2011, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page