Natural gasOperatingCPLE

Darlington County

Natural gas power plant in Darlington County, South Carolina. 316 MW of nameplate capacity across 2 generators, operated by Duke Energy Progress - (NC).

Also known as Darlington County Plant · EIA plant 3250

Analyst: free account, 1 question a day.

H B RobinsonStamey SolarSonoco Products Co1634 SolarJefferson Solar (SC)Luz SolarDarlington County5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
316 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 1997First generator online
Operator
Duke Energy Progress - (NC)EIA operator ID 3046
Grid
CPLEBalancing authority CPLE
Price nodes
None linkedNo verified ISO node
Location
Darlington County, SC34.4185, −80.1657
EIA plant ID
3250EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Darlington County produces

Free · EIA-923

Net generation, 2025

56.2 GWh

56,235 MWh, final

Capacity factor, 2025

2.0%

2024: 0.6%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

1.4–230.8

GWh a year. Low 2020, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000176,628Not reported12 of 12
2001103,755Not reported12 of 12
200280,727Not reported12 of 12
200327,261Not reported10 of 12
200411,311Not reported12 of 12
200562,903Not reported12 of 12
200662,587Not reported12 of 12
2007147,967Not reported12 of 12
200840,744Not reported6 of 12
200954,861Not reported12 of 12
2010136,7471.5%12 of 12
2011120,1241.3%12 of 12
201290,0711.0%12 of 12
201361,0030.7%12 of 12
201446,5370.8%8 of 12
2015110,832Not reported12 of 12
2016114,3911.3%12 of 12
201777,056Not reported12 of 12
2018230,819Not reported12 of 12
201921,0800.3%12 of 12
20201,375Not reported12 of 12
20213,858Not reported12 of 12
202295,1423.4%12 of 12
202322,1240.8%12 of 12
202417,0000.6%12 of 12
202556,2352.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

44,825

US short tons. 2024: 14,488

SO₂, 2025

0

US short tons

NOx, 2025

46

US short tons

CO₂ per MWh, calculated

0.80 t

About 1,594 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1, 10, 11, 12, 13, 2, 3, 4, and others), matched to EIA plant 3250 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
12Natural Gas Fired Combustion Turbine158.0May 1997
13Natural Gas Fired Combustion Turbine158.0June 1997

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Progress - (NC) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Darlington County and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Darlington County

More plants operated by Duke Energy Progress - (NC)

Questions about Darlington County

How much power does Darlington County produce?

Darlington County reported 56,235 MWh (56.2 GWh) of net generation in 2025, a 2.0% capacity factor on 316 MW of nameplate capacity.

Where is Darlington County?

Darlington County is in Darlington County, South Carolina, at 34.4185, −80.1657. It is in the Duke Energy Progress East balancing area (CPLE).

Who operates Darlington County?

EIA-860M for August 2026 lists Duke Energy Progress - (NC) as the operator (EIA operator ID 3046). The operator is not always the owner.

When did Darlington County start operating?

Its first generator began operating in May 1997, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page