Currant Creek

Natural gas power plant in Juab County, Utah. 566.9 MW of nameplate capacity across 3 generators, operated by PacifiCorp.

Also known as Currant Creek Power Plant · EIA plant 56102

Analyst: free account, 1 question a day.

PaysonFaraday SolarCurrant Creek20 km
Open in the map
6 plants within 38 km, from EIA coordinates.

Key facts

Capacity
566.9 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
June 2005First generator online
Operator
PacifiCorpEIA operator ID 14354
Grid
PACEBalancing authority PACE
Price nodes
None linkedNo verified ISO node
Location
Juab County, UT39.8214, −111.8935
EIA plant ID
56102EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Currant Creek produces

Free · EIA-923

Net generation, 2025

2.80 TWh

2,803,076 MWh, final

Capacity factor, 2025

56.4%

2024: 57.5%

January to July 2026

1.30 TWh

Provisional

Range, 2015 to 2025

1.2–2.9

TWh a year. Low 2017, high 2019

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005204,425Not reported12 of 12
20061,970,835Not reported12 of 12
20073,606,157Not reported12 of 12
20082,799,583Not reported12 of 12
20092,479,661Not reported12 of 12
20102,538,34851.1%12 of 12
20112,391,98248.2%12 of 12
20122,132,52342.8%12 of 12
20132,360,014Not reported12 of 12
20142,497,439Not reported12 of 12
20152,257,10639.7%12 of 12
20161,475,05025.9%12 of 12
20171,193,24221.0%12 of 12
20182,418,27542.5%12 of 12
20192,917,51651.3%12 of 12
20202,335,42641.0%12 of 12
20212,746,29048.3%12 of 12
20222,805,97949.4%12 of 12
20232,879,945Not reported12 of 12
20242,861,37957.5%12 of 12
20252,803,07656.4%12 of 12
2026 (provisional, partial year)1,300,94845.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

1.23M

US short tons. 2024: 1.25M

SO₂, 2025

6

US short tons

NOx, 2025

99

US short tons

CO₂ per MWh, calculated

0.44 t

About 879 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CTG1A, CTG1B), matched to EIA plant 56102 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Not reported

Dry cooling

Watershed stress

Moderate · 0.515

USGS SUI, HUC12 Mona Reservoir-Currant Creek

0 of 12 cooling months report withdrawal. Dry cooling with no reported withdrawal; not tested. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CT1ANatural Gas Fired Combined Cycle146.2June 2005
CT1BNatural Gas Fired Combined Cycle146.2June 2005
ST1Natural Gas Fired Combined Cycle274.5April 2006

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists PacifiCorp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Currant Creek and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Currant Creek

More plants operated by PacifiCorp

Questions about Currant Creek

How much power does Currant Creek produce?

Currant Creek reported 2,803,076 MWh (2.80 TWh) of net generation in 2025, a 56.4% capacity factor on 566.9 MW of nameplate capacity. From January to July 2026 it reported 1.30 TWh, which is provisional.

Where is Currant Creek?

Currant Creek is in Juab County, Utah, at 39.8214, −111.8935. It is in the PacifiCorp - East balancing area (PACE).

Who operates Currant Creek?

EIA-860M for August 2026 lists PacifiCorp as the operator (EIA operator ID 14354). The operator is not always the owner.

When did Currant Creek start operating?

Its first generator began operating in June 2005, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page