SolarBattery storageOperatingCAISO

Slate Hybrid

Solar and battery storage project in Kings County, California. 440.3 MW of nameplate capacity across 9 generators, operated by MN8 Energy LLC.

Also known as EIA plant 63727

This project groups Slate Hybrid (EIA 63727). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Henrietta D Energy Storage LLCRE Mustang LLCMustang TwoWestside Solar Power PV1American Kings Solar, LLCSlate Hybrid500 m
Open in the map
6 plants within 1.5 km, from EIA coordinates.

Key facts

Capacity
440.3 MWSolar 300.0 · Battery storage 140.3
Generators
9 operatingEIA-860M, August 2026
Operating since
November 2021First generator online
Operator
MN8 Energy LLCEIA operator ID 61944
Grid
CAISOBalancing authority CISO
Price nodes
5 CAISO nodesResource nodes with prices
Location
Kings County, CA36.2270, −119.8948
EIA plant ID
63727EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Slate Hybrid produces

Free · EIA-923

Net generation, 2025

727 GWh

727,184 MWh, final

Capacity factor, 2025

28.7%

2024: 25.8%

January to July 2026

435 GWh

Provisional

Range, 2023 to 2025

654.7–727.2

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
20219,6979.9%2 of 12
2022683,649Not reported11 of 12
2023701,61027.7%12 of 12
2024654,73525.8%12 of 12
2025727,18428.7%12 of 12
2026 (provisional, partial year)434,95629.6%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SL3ECSolar Photovoltaic67.5March 2022
SLATESolar Photovoltaic50.5November 2021
SLB3CBatteries33.8March 2022
SLBESBatteries50.0April 2022
SLBPWBatteries10.0March 2022
SLBSVBatteries46.5February 2022
SLPWRSolar Photovoltaic26.0March 2022
SLSTNSolar Photovoltaic63.0April 2022
SLSVCSolar Photovoltaic93.0February 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MN8 Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Slate Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Slate Hybrid

More plants operated by MN8 Energy LLC

Questions about Slate Hybrid

How much power does Slate Hybrid produce?

Slate Hybrid reported 727,184 MWh (727 GWh) of net generation in 2025, a 28.7% capacity factor on 440.3 MW of nameplate capacity. From January to July 2026 it reported 435 GWh, which is provisional.

Where is Slate Hybrid?

Slate Hybrid is in Kings County, California, at 36.2270, −119.8948. It is in the California Independent System Operator balancing area (CISO).

Who operates Slate Hybrid?

EIA-860M for August 2026 lists MN8 Energy LLC as the operator (EIA operator ID 61944). The operator is not always the owner.

Is Slate Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 300 MW and battery storage capacity totals 140.3 MW.

When did Slate Hybrid start operating?

Its first generator began operating in November 2021, according to EIA-860M.

Does InfraMap have power prices for Slate Hybrid?

Yes. InfraMap has CAISO day-ahead and real-time prices at 5 price nodes linked to Slate Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page