SolarBattery storageOperatingCAISO

BCE Seal Beach

Solar and battery storage project in Orange County, California. 28.7 MW of nameplate capacity across 2 generators, operated by BCE Seal Beach.

Also known as EIA plant 68023

This project groups BCE Seal Beach (EIA 68023). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

BCE Los Alamitos 2HaynesBCE Los Alamitos 1BCE Seal Beach2 km
Open in the map
6 plants within 6.6 km, from EIA coordinates.

Key facts

Capacity
28.7 MWSolar 12.0 · Battery storage 16.7
Generators
2 operatingEIA-860M, August 2026
Operating since
November 2025First generator online
Operator
BCE Seal BeachEIA operator ID 66555
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
Orange County, CA33.7328, −118.0445
EIA plant ID
68023EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power BCE Seal Beach produces

Free · EIA-923

Net generation, 2025

1.63 GWh

1,633 MWh, final. 2 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

10.4 GWh

Provisional. 6 of 7 months reported

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
20251,633Not reported2 of 12
2026 (provisional, partial year)10,42222.5%6 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SBBS1Batteries16.7November 2025
SBPV1Solar Photovoltaic12.0November 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists BCE Seal Beach as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query BCE Seal Beach and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near BCE Seal Beach

Questions about BCE Seal Beach

How much power does BCE Seal Beach produce?

BCE Seal Beach reported 1,633 MWh (1.63 GWh) of net generation in 2025. From January to July 2026 it reported 10.4 GWh, which is provisional. 2 of 12 months were reported for 2025.

Where is BCE Seal Beach?

BCE Seal Beach is in Orange County, California, at 33.7328, −118.0445. It is in the California Independent System Operator balancing area (CISO).

Who operates BCE Seal Beach?

EIA-860M for August 2026 lists BCE Seal Beach as the operator (EIA operator ID 66555). The operator is not always the owner.

Is BCE Seal Beach a solar or a battery storage plant?

Both. Solar capacity totals 12 MW and battery storage capacity totals 16.7 MW.

When did BCE Seal Beach start operating?

Its first generator began operating in November 2025, according to EIA-860M.

Does InfraMap have power prices for BCE Seal Beach?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to BCE Seal Beach, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page